SantiXS BOOK A CALL

GTM EXECUTION FOR THE PEOPLE WHO OWN THE NUMBER

when the work works,
but the pipeline doesn't.

revenue still rests on one person. we build the system that grows it past them.

start a working conversation

OPERATORS WE'VE BUILT WITH

  • THK logo
  • topcoder logo
  • Lifescience plus logo
  • Traject Data logo
  • Build With Wave logo
  • OpenSesame logo
  • Schoox logo
  • Torc.dev logo
  • Passportage logo

OUR CONVICTION

most growth problems are systems problems disguised as people problems.

you rarely need another strategy deck. you need someone accountable for turning what your team already knows into a motion that compounds. as ownership becomes explicit, the noise drops and the motion becomes something you can teach.

WHAT THE WORK LOOKS LIKE

  • what the system said was happening
  • what actually happened

01the number is not the work

activity gets counted that has nothing behind it. replies sit in a cadence nobody removed them from, and the reporting understates most of the team. nobody is lying. nobody can see.

02fix the pipe before you read the gauge

one source of truth and the rest dated and archived. the data path gets repaired before anybody is measured on what comes out of it, and every person can see their own number against their own target.

03the number and the work agree

the manager can say why it moved, not just who moved it. from here every fix compounds, because it lands on a system that holds it rather than on a person who carries it.

WHERE IT STOPS WORKING

one of these is why you are reading this.

the person accountable for growth feels the constraint before the dashboard can name it.

the engine stopped

referrals dried up, and your known accounts are worked through.

run for volume

an agency is on it, the monthly report looks healthy, and the pipeline does not agree with the report.

the motion left

someone good left, and the part that made it work turned out to be in their head rather than in Highspot or Notion.

nobody can say what moved it

revenue is up. two motions with different economics are reporting on one line, and nobody can tell you which one did it.

see what three teams thought was wrong, and what actually was

THE OPERATING LAYER

motion. system. team.

revenue changes when all three move together, not when one department optimizes its own piece.

01

motion

what buyers move through

  • icp and signal
  • message and offer
  • qualification and handoff
02

system

what makes it repeatable

  • workflow and rules
  • tools and data
  • measurement and learning
03

team

who owns the judgment

  • roles and decisions
  • coaching and cadence
  • capability and handoff

align operate transfer

THE OPERATING MODEL

diagnose. build. run. hand off.

the same four phases every time, and the last one starts in the first week.

  1. 01

    diagnose

    1 to 2 weeks

    find the few constraints that explain the noise, read with the people doing the work.

  2. 02

    build

    2 to 4 weeks

    turn the diagnosis into a motion your team can actually run.

  3. 03

    run

    ongoing, or sprint scoped

    operate it close enough to learn what is true, and correct in the week it happens.

  4. 04

    hand off

    from the first week

    documented as it is built, so the team learns by doing rather than inheriting a binder.

Patrick Santiago, founder of SantiXS

OPERATOR LED BY DESIGN

senior accountability. specialist depth when the work calls for it.

patrick leads every engagement directly. a trusted partner network adds gtm engineering, design, marketing execution and paid acquisition when the work needs it, named before they start rather than assigned from a roster.

"Patrick has a rare mix of big-picture vision and hands-on hustle that gets things done. He grew our partner network, expanded our reach, and set the team up for long-term success."

DOUG HANSON, CEO, TOPCODER

WHAT IT COSTS

no packages.

every engagement is scoped to the work in front of it. two shapes, and you will know which one you are in before you sign anything.

A BUILD SPRINT
low five figures, scoped to the work. six to eight weeks, deliverables named up front.
A RUNNING RETAINER
mid four figures a month, for as long as we are operating the motion with you.

read what people ask before they start

A WORKING CONVERSATION

if pipeline is the part you're stuck on, let's talk.

30 minutes. no slides. no pitch.